site banner

Culture War Roundup for the week of April 8, 2024

This weekly roundup thread is intended for all culture war posts. 'Culture war' is vaguely defined, but it basically means controversial issues that fall along set tribal lines. Arguments over culture war issues generate a lot of heat and little light, and few deeply entrenched people ever change their minds. This thread is for voicing opinions and analyzing the state of the discussion while trying to optimize for light over heat.

Optimistically, we think that engaging with people you disagree with is worth your time, and so is being nice! Pessimistically, there are many dynamics that can lead discussions on Culture War topics to become unproductive. There's a human tendency to divide along tribal lines, praising your ingroup and vilifying your outgroup - and if you think you find it easy to criticize your ingroup, then it may be that your outgroup is not who you think it is. Extremists with opposing positions can feed off each other, highlighting each other's worst points to justify their own angry rhetoric, which becomes in turn a new example of bad behavior for the other side to highlight.

We would like to avoid these negative dynamics. Accordingly, we ask that you do not use this thread for waging the Culture War. Examples of waging the Culture War:

  • Shaming.

  • Attempting to 'build consensus' or enforce ideological conformity.

  • Making sweeping generalizations to vilify a group you dislike.

  • Recruiting for a cause.

  • Posting links that could be summarized as 'Boo outgroup!' Basically, if your content is 'Can you believe what Those People did this week?' then you should either refrain from posting, or do some very patient work to contextualize and/or steel-man the relevant viewpoint.

In general, you should argue to understand, not to win. This thread is not territory to be claimed by one group or another; indeed, the aim is to have many different viewpoints represented here. Thus, we also ask that you follow some guidelines:

  • Speak plainly. Avoid sarcasm and mockery. When disagreeing with someone, state your objections explicitly.

  • Be as precise and charitable as you can. Don't paraphrase unflatteringly.

  • Don't imply that someone said something they did not say, even if you think it follows from what they said.

  • Write like everyone is reading and you want them to be included in the discussion.

On an ad hoc basis, the mods will try to compile a list of the best posts/comments from the previous week, posted in Quality Contribution threads and archived at /r/TheThread. You may nominate a comment for this list by clicking on 'report' at the bottom of the post and typing 'Actually a quality contribution' as the report reason.

7
Jump in the discussion.

No email address required.

You'll need enormous amounts of transmission capacity to take solar electricity from California over the mountains to the East Coast or down from Northern Canada.

Surely something like Texas would make more sense than California here? There's a lot of empty land in the South.

That would be better, but not significantly enough so to solve the underlying problem.

This is a bit old (2007), but the fundamental challenges and dynamics are still valid, and material sciences involved in transmission haven't change that much.

In a nutshell, at a relatively normal transmission line cost/load, you can stand to lose about 8% of generated per 1000 miles. (This is very rough- it can be notably better, or considerably worse.) That means you have to push more (to get what you need at the end), and you're paying for what is required to be generated, as opposed to what is consumed. This assumes away any disruptions to the transmission paths, such as any sort of natural disaster / malign actor effort to disrupt the transmission medium. (Hope you don't have any strategic rivals who can afford cyber-attacks / drones.)

It makes far, far more sense from just about any planning context other than ideology- whether financial or reliability or safety or resiliency to hostile interests- to just generate the power considerably closer to the consumer. Given that the overwhelming most important aspect of an electrical grid at scale is baseline power- the ability to meet the need you have as you need it- it doesn't really make sense to invest in mass-renewable, short or long distance, if you're just going to need a redundant power generation capability anyways.

Aren't the British trying to run a cable from Iceland for geothermal?

You are probably thinking of the Icelink proposal.

This was a proposal as opposed to a project, and more or less died in the later 2010s at the Feasibility study level. There are probably three main reasons for that. One, cost-benefit on a technical level, as Icelink was more of an environmental proposal for UK governments to boast green credentials than an actual way to most efficiently use green energy in industry (as you could just invest the energy consumption infrastructure in Iceland). Two, related to cost and benefit, was Brexit, on top of the internal budget disruption to the UK governmental also put the UK and Iceland on opposite sides of the EU single market wall at a time when UK and EU relations at the regulatory and policy level were, shall we say, uninterested in major investments to the UK benefit. Third was the point that any UK investment in Icelink would land in territories with significant risk of separating from the UK over the medium/long term, as the cables would either naturally land in Scotland- where the SNP was having a strong period and polling near-majorities in hypothetical separation referendums- or in Northern Ireland- which the post-Brexit EU policy was to have economically segregated from the rest of the UK economic-legal architecture. A major, UK-level investment which would provide EU baseload power to territories with significant political interests who would rather be a part of the EU than UK would be a territorial integrity risk.

So, don't expect it to go through.

Which is a shame, because when it is available at economically viable rates, geothermal is one of the 'better' green power systems because it meets the baseload power requirements of predictable, non-swingy power. The economic viability is dependent on geography that isn't necessarily where you want it, but that's actually why long-range transmission makes sense in that context because you can't simply build a closer geothermal plant, but geothermal is good baseload generation and if you do build it, you don't have to build duplicative generation capacity like with intermittant green sources.

Meanwhile the Germans are planning to run a cable from Morocco for that sweet sweet solar power.

https://finance.yahoo.com/news/britain-risks-losing-germany-16bn-155135780.html

Not really what your article shows, which doesn't actually indicate a German government role. Rather, it's a threat by the company that wants to be paid to build the project in order to pressure the UK to provide more money, with the threat to build to Germany instead. However, the article doesn't claim that Germany is interested in this, and the underlying context is that the company (XLinks) is in the capital/financing accumulation phase (trying to identify investor governments), of which the UK was the primary interested investor.

Xlinks garnered initial UK interest, in the 'UK is sending civil servants to study this in depth if it actually makes sense' sort, because it claimed the project would be profitable for it if it was guaranteed a solar energy cost floor (minimal price) of 48 pounds per MegaWatt Hour (GBP/MWh), when the UK cost is generally higher. The route was intended to be a shallow-water cable basically bypassing Spain to go direct to the UK, meaning it wasn't to enter the EU energy market (which would risk/compromise the viability of the project for the UK for multiple reasons).

But that's kind of where the project has stalled. It's unclear if the UK found other information indicating it's not viable, whether the costs are higher than initially advertised, or what. But implicitly the project is under negotiation. And this article isn't the Germans saying they want in, but rather the company involved threatening to go ask the Germans to see if they want to replace the UK as the recipient... but naturally if the UK isn't delivered to, it's not going to be a load-carrying investor, and as for the Germans...

Well, there are a couple problems for that. One being that it have to enter the European energy grid, unlike the sea transmission route to the UK, and the French have typically opposed solar transmission network proposals (such as from Spain) linking solar producers to their consumers... surely unrelated to France's own substantial electricity exports to Germany, and its desire to expand its nuclear energy exports to its European neighbors.

But there's also the point that the Xlinks Morocco project started being pushed in 2021, and the Ukraine War kicked off in 2022. Germany energy policy since has been about (re)building natural gas import capacity, as natural gas is not only critical for stable baseload power generation, but specifically as an input for many of Germany's industrial processes as a resoruce separate from the electricity. As a result, Germany's energy investment priority has been on scaling up its import capacity / storage for gas as it fights to keep as much industrial capacity as it can.